ASTM A514 Gr.P steel plate enter the slab warehouse from continuous casting or roughing mills. The ASTM A514 Gr.P steel plate is removed by crane and stored in the warehouse. ASTM A514 Gr.P steel plate is suspended from the rails one by one by the crane and then transported to the furnace for heating.
There are continuous heating furnaces and griddle furnaces. The heated slab is conveyed to the vertical scale by the output rail and the first scale is removed. Then ASTM A514 Gr.P steel plate enters the first, second double roll roughing mill, rolling back and forth three or five times, and then entering the third and fourth four-roll roughing mill for continuous rolling.
Welcome to purchase ASTM A514 Gr.P steel plate, we can supply the high quality ASTM A514 Gr.P steel plate with low cost. If you have any need of ASTM A514 Gr.P steel plate, please contact us freely!